Scioto County Roadwork


Craig J. Opperman P.E., Scioto County Engineer, announced the work schedule for the week of December 7, 2015 through December 11, 2015 for his office.

ROAD CLOSURE

Big Run Road (CR136) in Morgan Township at the 3.790 mile marker will be closed Monday, December 7th and Tuesday, December 8th day and night. The location of the closure is between Buck Hollow Road and State Route 104. County Engineer’s crew will be installing a concrete box culvert.

Brame Road (CR61) in Madison Township at the 0.567 and 1.535 mile markers will be closed Monday, December 7th from 8:00 A.M. to 4:00 P.M. The location of the closure is between White Gravel – McDaniel Road and White Gravel – Dewey Road. County Engineer’s crew will be installing plastic pipes.

Great Meadow Road (CR51) in Bloom Township at the 2.920 mile marker will be closed Tuesday, December 8th from 8:00 A.M. to 12:00 P.M. The location of the closure is between Webster Hope Road and McGuire Road. County Engineer’s crew will be installing a plastic pipe.

Great Meadow Road (CR51) in Bloom Township at the 4.084 mile marker will be closed Tuesday, December 8th from 12:00 P.M. to 4:00 P.M. The location of the closure is between Webster Hope Road and Lick Run – Lyra Bloomswitch Road. County Engineer’s crew will be installing a plastic pipe.

Lick Run – Lyra Bloomswitch Road (CR2) in Bloom Township at the 13.828 and 14.905 mile markers will be closed Wednesday, December 9th from 8:00 A.M. and 4:00 P.M. The location of the closure is between Great Meadow Road and State Route 140. County Engineer’s crew will be installing plastic pipes.

Fairground Road (CR55) in Valley Township at the 1.180 mile marker will be closed Wednesday, December 9th through Friday, December 11th day and night. The location of the closure is between Millers Run – Fallen Timber Road and U.S. Route 23. County Engineer’s crew will be installing a concrete pipe.

White Gravel – Dewey Road (CR24) in Madison Township at the 0.407, 0.523, 0.638 and 0.989 mile markers will be closed Thursday, December 10th and Friday, December 11th from 8:00 A.M. to 4:00 P.M. each day. The location of the closure is between Richard Road and State Route 776. County Engineer’s crew will be installing plastic pipes.

Germany Hollow Road (CR6) in Vernon Township at the 2.230 mile marker will be closed Thursday, December 10th and Friday, December 11th day and night. The location of the closure is between Jones Road and Bussey Road. County Engineer’s crew will be installing a concrete pipe.

ROAD CONSTRUCTION

Pine Creek Road (CR10) in Bloom Township continues to be closed through Friday, December 11th day and night. Allard Excavating is doing reconstruction.

comments powered by Disqus